How to build a Raft - Part 1
- expeditionleeway25
- Mar 12
- 1 min read
Updated: Mar 26
Week 2: 10.03. - 12.03.
We started by removing the roof beneath where the logs and crossbeams had been drying since Easter 2024. Afterwards, we spread them apart to work on each one. Then, we had to remove the bark from two crossbeams, the mast, and the yard. We also planned how the base would be constructed.